$4,549

$24 per square foot over 192 ft²

Save these results

Includes your inputs, the full breakdown, and every row of the table.

Decking needed

458 linear ft

26 rows × 16.0 ft

Joists

13 at 12.0 ft

16" on center

Posts & footings

6

Deck screws

~2,197

Two per board per joist

Breakdown
Deck area
192 ft²
Decking (458 lf incl. 10% waste)
$1,464
Framing (250 lf)
$525
Railing (40 lf)
$2,200
Hardware, hangers & footings
$360
Total materials
$4,549
With labor (roughly 2×)
$9,098

What this means

  • At 16" on center you need 13 joists. Composite decking generally requires 16" maximum, and 12" for diagonal patterns.
  • Board lengths come in even increments — 8, 12, 16, and 20 feet. Planning your deck dimensions around those lengths dramatically reduces waste and the number of butt joints.
  • This covers materials only. Professional labor typically doubles the total, and permits, stairs, and footings below the frost line add more.

How the deck calculation works

A deck estimate has three material groups: the decking surface, the frame beneath it, and the railing. Decking is calculated by dividing deck width by the effective coverage of one board — its actual width plus the gap — to get the number of rows, then multiplying by deck length.

Joist spacing determines both cost and feel. Sixteen inches on center is standard for pressure-treated lumber laid perpendicular. Most composite manufacturers require sixteen inches maximum and twelve inches for diagonal installations, since composite is less stiff than wood.

Frequently asked questions

How much does it cost to build a deck?

Materials for a pressure-treated deck run roughly $15-25 per square foot; composite runs $30-60. Professional installation typically doubles the total.

What gap should I leave between deck boards?

About 3/16 inch for kiln-dried lumber and composite. Wet pressure-treated boards shrink as they dry, so they can be installed nearly tight and will open up on their own.

Related calculators

Spotted a problem, or want this calculator to do more?Corrections are fixed first, and the most-requested features get built next.Tell us →

Disclaimer. This calculator is provided for general information and educational purposes only and does not constitute financial, tax, legal, medical, or engineering advice. Results are estimates based on the inputs you provide and the assumptions described above. Confirm any figure with a qualified professional before acting on it.